construction progress week 5

Posted by sew4tejhtr6ier Rabu, 28 November 2012 0 komentar

we just officially finished week 5 of construction, and a lot has been done so far! the entire main floor is framed and the second floor is not far behind.

here is what has happened in the last 2 weeks:



the entire second floor was decked and a few exterior walls have been framed and one has been erected...he's a little lonely right now, but hopefully by the end of the week, he will have
some friends.


the rest of the  walls were added to the main floor...this is a view looking into the master bathroom from the master bedroom.


from the kitchen, looking into the dining and living rooms.


we can now see all of the rooms and their sizes. this is a view from the front door.


headers over doors were framed. cased openings were set.


gravel was dumped and shoveled into the garage and basement, in preparation for the concrete slabs to be poured later this week.


unfortunately, our framers had another job they had to do, so they stopped working early last week and will not be back until the end of this week. i can't wait until the stairs to the basement are framed! this monstrous hole is about to give my husband and i a heart attack!


TERIMA KASIH ATAS KUNJUNGAN SAUDARA
Judul: construction progress week 5
Ditulis oleh sew4tejhtr6ier
Rating Blog 5 dari 5
Semoga artikel ini bermanfaat bagi saudara. Jika ingin mengutip, baik itu sebagian atau keseluruhan dari isi artikel ini harap menyertakan link dofollow ke http://wallpaper-borders7.blogspot.com/2012/11/construction-progress-week-5.html. Terima kasih sudah singgah membaca artikel ini.

0 komentar:

Posting Komentar

Trik SEO Terbaru support Online Shop Baju Wanita - Original design by Bamz | Copyright of wallpaper borders.