construction progress: week 25 (big changes!)

Posted by sew4tejhtr6ier Sabtu, 27 April 2013 0 komentar
i have been waiting for this week for months!
a LOT got done this week!
a crazy amount of work, actually. 
the house no longer feels like a construction site! it feels like a house that will be a HOME in just a few weeks.

here is what happened:
the counter tops were installed! hooray! 

i chose a honed carrara marble for both the kitchen and the master bathroom.

see that HOLE IN the wall?
it's going to a tv, hidden behind a two way mirror, both of which will installed...eventually.
i will be writing a more in-depth post on this project once it is underway!

the sinks were installed, and the holes cut for the plumbing fixtures.
i am really happy with the sinks that i choose. you can read more about my sink adventures here.

we were able to stay on budget with our counter tops because we installed granite remnants in the two upstairs bathrooms. for this bathroom (the girls bathroom) i wanted something really light. there were not many options, but we managed to find one that works with the floor tile. if i had a bigger budget, i would have selected something different, but i am happy with the way it turned out!

the interior doors were hung. the doors are painted benjamin moore's "blackjack"

the electricians started adding the outlets and switches.


that took about two days...

and then, on the last day, a huge crew showed up and installed all of the light  fixtures.

here is my vintage lantern, all rewired and waiting to be hung in the girls upstairs bathroom.

the master bathroom, complete with hardware, faucet  and sconces! we still need to get the backsplash installed.

the restoration hardware barn light over the toilet is such a fun touch!
you can see the entire board that i created for the master bathroom here.

a look at the completed master bathroom shower.

a look at the master bathroom from the master bedroom. the doors at the end are to a linen closet and  will eventually be covered with full length mirrors.

my bargain circa light fixture for the powder room ceiling.

the hardware was installed on the kitchen cabinets, as well as the faucet. you can read more about my hardware selection here.

a look at the kitchen from the great room. 

there will eventually be two pendants over the island, as well as a light fixture in the dining area but they wont be purchased for a while.

another view of the kitchen cabinets.
can you spot the slightly longer pulls on the larger pantry doors and the latches on the cabinets over the fridge/freezer?

i opted for a ballard designs semi flush mount in my younger daughters room.
i will most likely change the finish on this in the coming weeks!

the fronts to the drawers that will be installed under the sink in the island.
getting those pulls in was a bear! (according to my cabinet fabricator.) but totally worth it, according to me.

the (real, working) hood got installed.

there were a few times when the electricians, the plumbers and the cabinet guys were all there at the same time. it was a frenzy of stuff getting DONE. i LOVED it.

a view of the back hallway, leading out the the garage. the laundry room is to the right, and there is a closet and area for some future built-ins is to the left.
you can read about the light fixtures i chose for the hallway here.

the microwave got installed under the island counter top. 
sometime before we move in, the microwave will be trimmed out to make it look more built-in.

on the OUTSIDE of the house...
the mammoth retaining wall in the back of the house was worked on. a lot of labor and sweat has gone into building that thing! A. LOT.

\he front retaining wall was worked on...
(the blocks will eventually be covered in stone just like the bottom of the house. eventually.
notice how the "eventually's" are starting to add up?)

and the side retaining wall along the driveway was started.
in this picture you can see the concrete footing for the wall...

there were also a few long nights doing what else...cleaning!
(at least the piles of stuff are getting smaller and smaller.)
the upstairs floors had to be completely clean in preparation for the carpet!
i actually had to vacuum the ENTIRE upstairs with the tiny attachment that you see in my hand in the above picture.

oh, and of COURSE that attachment doesn't hook up to the "regular/long handle" on the shop vac. it only attaches directly to the hose...
so imagine me, scooting around on my hands and knees vacuuming about 1800 SF with a 5" wide vacuum attachment.
i felt like an 80 year old lady when i was done! "oh...my back! my knees!"

don't be fooled by this picture....she only vaccumed for about 25 square feet...
(child labor is great when you can get the CHILD to actually LABOR!)

ah....but onto more big changes...
carpet!
(cue the angels singing!)

nothing changes the look of a house more than carpet!
first, the pad went down...

and then the carpet was laid.
the entire house was done in just a few hours. it was amazing!

a look down the upstairs hall--looking towards the bonus room.

the bonus room.
the wall color doesnt look as green in real life, by the way.

ah...the stairs.
ok, so the original plan was just to lay the carpet everywhere, and then come back in a few years and lay wood treads and a nice runner.
well, the pine treads looked so great when they were installed that we thought we would just go ahead and paint them.
but THEN, it became clear that it was going to be more labor intensive, and therefor more $$ than we wanted to spend, so we decided to lay carpet on ALL of the stairs except the bottom 7 stairs from the landing to the main floor. the treads will be painted black, but we will wait until after we move so they don't get damaged.

and my favorite picture:
CARPET ANGELS!
that's what my 9 year old son yelled as he dropped to the ground and gave the carpet an official "welcome."

anyway, SO much has changed this week! it has been so exciting to watch everything come together!
of course, it also made me realize how many things are "missing".
as i was walking a friend through the house, i kept saying "eventually, there will be a fireplace/crown molding/built-ins/coffered ceiling/a "real" light fixture/paneling/custom storage piece/blah....blah....blah."
 we have 95% of the house done, but its that last 5% that really makes a home feel polished and delicious, don't you think?
and besides, you can follow along with me over the next who-knows-how-long as i add that final 5%!

happy weekend friends!

TERIMA KASIH ATAS KUNJUNGAN SAUDARA
Judul: construction progress: week 25 (big changes!)
Ditulis oleh sew4tejhtr6ier
Rating Blog 5 dari 5
Semoga artikel ini bermanfaat bagi saudara. Jika ingin mengutip, baik itu sebagian atau keseluruhan dari isi artikel ini harap menyertakan link dofollow ke http://wallpaper-borders7.blogspot.com/2013/04/construction-progress-week-25-big.html. Terima kasih sudah singgah membaca artikel ini.

0 komentar:

Posting Komentar

Trik SEO Terbaru support Online Shop Baju Wanita - Original design by Bamz | Copyright of wallpaper borders.